Birmingham Airport Authority(Alabama) Government Bid and Contract Opportunities

Results 101 - 150 of 192
Bid Summary

[AL] RFQ: Airfield Marking Application Addendum #2

RFQ: Airfield Marking Application Addendum #2 (06/17/2025)

Birmingham Airport Authority | Alabama

Posted on 6/17/2025
Due by 6/24/2025

[AL] RFP: Flight Information Display System

RFP: Flight Information Display System (06/16/2025)

Birmingham Airport Authority | Alabama

Posted on 6/16/2025
Due by 7/07/2025

[AL] RFP: Public Announcement System

RFP: Public Announcement System (06/16/2025)

Birmingham Airport Authority | Alabama

Posted on 6/16/2025
Due by 7/23/2025

[AL] Invitation to Bid: Terminal Restroom and SARA Renovations Pre-Bid Sign In

Invitation to Bid: Terminal Restroom and SARA Renovations Pre-Bid Sign In (06/11/2025)

Birmingham Airport Authority | Alabama

Posted on 6/11/2025
Due by 6/26/2025

[AL] Invitation to Bid: Terminal Restroom and SARA Renovations Addendum #1

Invitation to Bid: Terminal Restroom and SARA Renovations Addendum #1 (06/10/2025)

Birmingham Airport Authority | Alabama

Posted on 6/10/2025
Due by 6/26/2025

[AL] RFP: Pedestrian Crosswalk Safety Upgrades Addendum #2

RFP: Pedestrian Crosswalk Safety Upgrades Addendum #2

Birmingham Airport Authority | Alabama

Posted on 6/03/2025
Due by 6/04/2025

[AL] Invitation to Bid: Runway Intersection Drainage Improvements Pre-Bid Presentation

Invitation to Bid: Runway Intersection Drainage Improvements Pre-Bid Presentation (06/03/2025)

Birmingham Airport Authority | Alabama

Posted on 6/03/2025
Due by 6/09/2025

[AL] Invitation to Bid: Terminal Restroom and SARA Renovations

Invitation to Bid: Terminal Restroom and SARA Renovations (05/29/2025)

Birmingham Airport Authority | Alabama

Posted on 5/29/2025
Due by 6/26/2025

[AL] RFQ: Airfield Marking Application

RFQ: Airfield Marking Application (05/29/2025)

Birmingham Airport Authority | Alabama

Posted on 5/29/2025
Due by 6/18/2025

[AL] RFP: Pedestrian Crosswalk Safety Upgrades Addendum #1

RFP: Pedestrian Crosswalk Safety Upgrades Addendum #1 (05/28/2025)

Birmingham Airport Authority | Alabama

Posted on 5/28/2025
Due by 6/02/2025

[AL] RFP: Pedestrian Crosswalk Safety Upgrades

RFP: Pedestrian Crosswalk Safety Upgrades (05/12/2025) RFP: Pedestrian Crosswalk Safety Upgrades Exhibit A (05/12/2025) RFP:…

Birmingham Airport Authority | Alabama

Posted on 5/19/2025
Due by 6/02/2025

[AL] Invitation to Bid: Runway Intersection Drainage Improvements

Invitation to Bid: Runway Intersection Drainage Improvements (05/19/2025)

Birmingham Airport Authority | Alabama

Posted on 5/19/2025
Due by 6/09/2025

[AL] Pedestrian Crosswalk Safety Upgrades RFP

Pedestrian Crosswalk Safety Upgrades RFP (05/12/2025) Pedestrian Crosswalk Safety Upgrades RFP Exhibit A (05/12/2025) Pedestrian…

Birmingham Airport Authority | Alabama

Posted on 5/12/2025
Due by 6/02/2025

[AL] Explosive Detection Equipment Addendum #2

Explosive Detection Equipment Addendum #2 (05/01/2025)

Birmingham Airport Authority | Alabama

Posted on 5/01/2025
Due by 5/12/2025

[AL] Valet Parking Concessions Addendum #4

Valet Parking Concessions Addendum #4 (04/29/2025)

Birmingham Airport Authority | Alabama

Posted on 4/29/2025
Due by 5/14/2025

[AL] Radio System Replacement Addendum #2

Radio System Replacement Addendum #2 (04/22/2025)

Birmingham Airport Authority | Alabama

Posted on 4/28/2025
Due by 5/08/2025

[AL] Radio System Replacement Addendum #3

Radio System Replacement Addendum #3 (04/28/2025)

Birmingham Airport Authority | Alabama

Posted on 4/28/2025
Due by 5/08/2025

[AL] Permanent Roof Repair Addendum #3

Permanent Roof Repair Addendum #3 (04/28/2025)

Birmingham Airport Authority | Alabama

Posted on 4/28/2025
Due by 5/19/2025

[AL] Runway Intersection Drainage Improvements Addendum #2

Runway Intersection Drainage Improvements Addendum #2 (04/24/2025)

Birmingham Airport Authority | Alabama

Posted on 4/24/2025
Due by 4/29/2025

[AL] Valet Parking Concessions Addendum #3

Valet Parking Concessions Addendum #3 (04/24/2025)

Birmingham Airport Authority | Alabama

Posted on 4/24/2025
Due by 5/14/2025

[AL] Valet Parking Concessions Addendum #3 Supporting Attachments

Valet Parking Concessions Addendum #3 Supporting Attachments (04/24/2025)

Birmingham Airport Authority | Alabama

Posted on 4/24/2025
Due by 5/14/2025

[AL] Valet Parking Concessions Addendum #2 Supporting Attachments

Valet Parking Concessions Addendum #2 Supporting Attachments (04/17/2025)

Birmingham Airport Authority | Alabama

Posted on 4/23/2025
Due by 4/30/2025

[AL] Valet Parking Concessions Addendum #2

Valet Parking Concessions Addendum #2 (04/17/2025)

Birmingham Airport Authority | Alabama

Posted on 4/23/2025
Due by 4/30/2025

[AL] Permanent Roof Repair Addendum #1

Permanent Roof Repair Addendum #1 (04/22/2025)

Birmingham Airport Authority | Alabama

Posted on 4/22/2025
Due by 4/24/2025

[AL] Permanent Roof Repair Addendum #2

Permanent Roof Repair Addendum #2 (04/22/2025)

Birmingham Airport Authority | Alabama

Posted on 4/22/2025
Due by 4/28/2025

[AL] Explosive Detection Equipment Addendum #1

Explosive Detection Equipment Addendum #1 (04/21/2025)

Birmingham Airport Authority | Alabama

Posted on 4/21/2025
Due by 5/01/2025

[AL] Valet Parking Concessions Pre-bid Presentation

Valet Parking Concessions Pre-bid Presentation (04/16/2025) Valet Parking Concessions Pre-bid Attendance (04/16/2025)

Birmingham Airport Authority | Alabama

Posted on 4/16/2025
Due by 4/30/2025

[AL] Runway Intersection Drainage Improvements Addendum #1

Runway Intersection Drainage Improvements Addendum #1 (04/14/2025)

Birmingham Airport Authority | Alabama

Posted on 4/14/2025
Due by 4/29/2025

[AL] Radio System Replacement Pre-bid Attendance

Radio System Replacement Pre-bid Attendance (04/14/2025)

Birmingham Airport Authority | Alabama

Posted on 4/14/2025
Due by 5/01/2025

[AL] Radio System Replacement Pre-bid Presentation

Radio System Replacement Pre-bid Presentation (04/14/2025)

Birmingham Airport Authority | Alabama

Posted on 4/14/2025
Due by 5/01/2025

[AL] Taxiway H Realignment and Strengthening Addendum #2

Taxiway H Realignment and Strengthening Addendum #2 (04/14/2025)

Birmingham Airport Authority | Alabama

Posted on 4/14/2025
Due by 4/17/2025

[AL] Valet Parking Concessions Addendum #1

Valet Parking Concessions Addendum #1 (04/14/2025)

Birmingham Airport Authority | Alabama

Posted on 4/14/2025
Due by 4/30/2025

[AL] Removal and Installation of New Insulation in the Parking Deck RFQ

Removal and Installation of New Insulation in the Parking Deck RFQ (04/10/2025)

Birmingham Airport Authority | Alabama

Posted on 4/10/2025
Due by 5/05/2025

[AL] Restriping Entrance, Exits and Lower-Level Curbs Addendum #1

Restriping Entrance, Exits and Lower-Level Curbs Addendum #1 (04/09/2025)

Birmingham Airport Authority | Alabama

Posted on 4/09/2025
Due by 4/11/2025

[AL] Radio System Replacement Addendum #1

Radio System Replacement Addendum #1 (04/08/2025)

Birmingham Airport Authority | Alabama

Posted on 4/08/2025
Due by 5/01/2025

[AL] Roof Repair RFQ

Roof Repair RFQ (04/08/2025)

Birmingham Airport Authority | Alabama

Posted on 4/07/2025
Due by 4/21/2025

[AL] Taxiway H Realignment and Strengthening Addendum #1

Taxiway H Realignment and Strengthening Addendum #1 (04/04/2025)

Birmingham Airport Authority | Alabama

Posted on 4/04/2025
Due by 4/17/2025

[AL] Runway Intersection Drainage Improvements Invitation to Bid

Runway Intersection Drainage Improvements Invitation to Bid (04/01/2025)

Birmingham Airport Authority | Alabama

Posted on 4/01/2025
Due by 4/29/2025

[AL] Parking Deck Insulation RFQ

Parking Deck Insulation RFQ (03/25/2025)

Birmingham Airport Authority | Alabama

Posted on 4/01/2025
Due by 4/15/2025

[AL] Civil Engineering Services: Northeast Quadrant Grading Improvements RFQ

Civil Engineering Services: Northeast Quadrant Grading Improvements RFQ (03/31/2025)

Birmingham Airport Authority | Alabama

Posted on 3/31/2025
Due by 5/13/2025

[AL] Explosive Detection Equipment RFP

Explosive Detection Equipment RFP (03/27/2025)

Birmingham Airport Authority | Alabama

Posted on 3/27/2025
Due by 5/01/2025

[AL] Radio System Replacement RFP

Radio System Replacement RFP (03/27/2025)

Birmingham Airport Authority | Alabama

Posted on 3/27/2025
Due by 5/01/2025

[AL] Copiers for the Office Addendum #1

Copiers for the Office Addendum #1 (03/26/2025)

Birmingham Airport Authority | Alabama

Posted on 3/26/2025
Due by 3/31/2025

[AL] Restriping Entrance, Exits and Lower-Level Curbs RFQ

Restriping Entrance, Exits and Lower-Level Curbs RFQ (03/20/2025)

Birmingham Airport Authority | Alabama

Posted on 3/20/2025
Due by 4/07/2025

[AL] Valet Parking Concessions RFP

Valet Parking Concessions RFP (03/20/2025)

Birmingham Airport Authority | Alabama

Posted on 3/20/2025
Due by 4/30/2025

[AL] Removal and Install of Uninterruptible Power Supply for TSA Addendum #1

Removal and Install of Uninterruptible Power Supply for TSA Addendum #1 (03/18/2025)

Birmingham Airport Authority | Alabama

Posted on 3/18/2025
Due by 3/24/2025

[AL] Removal and Install of Uninterruptible Power Supply for TSA Pre-bid Presentation

Removal and Install of Uninterruptible Power Supply for TSA Pre-bid Presentation (03/10/2025)

Birmingham Airport Authority | Alabama

Posted on 3/18/2025
Due by 3/24/2025

[AL] Valet Parking RFP

Valet Parking RFP (03/18/2025)

Birmingham Airport Authority | Alabama

Posted on 3/18/2025
Due by 4/23/2025

[AL] Air Cargo Building 2 Power Supply Addendum #2

Air Cargo Building 2 Power Supply Addendum #2 (03/17/2025)

Birmingham Airport Authority | Alabama

Posted on 3/18/2025
Due by 4/04/2025

[AL] Removal and Install of Uninterruptible Power Supply for TSA RFP

Removal and Install of Uninterruptible Power Supply for TSA RFP (03/03/2025)

Birmingham Airport Authority | Alabama

Posted on 3/18/2025
Due by 3/24/2025
Results 101 - 150 of 192

City Index